See our innovative edge protection barriers in action

The Ageas Bowl

Date: 14/02/2013
Location: Southampton
Main Contractor: Denizen Contracts
Steelwork Contractor: Morgans of Usk

Colchester Academy

Date: 05/02/2013
Location: Colchester, Essex
Main Contractor: Carillion
Steelwork Contractor: Mifflin Construction Ltd

Notre Dame Catholic College

Date: 23/11/2012
Location: Liverpool
Main Contractor: Willmott Dixon
Steelwork Contractor: B&K Structures Ltd

Monmouth Boys School

Date: 19/11/2012
Location: Monmouth, Gwent
Main Contractor: ISG Pearce Ltd
Steelwork Contractor: Dollcast Engineering Ltd

Timber Frame Apartments

Date: 28/09/2012
Location: Ber Street, Norwich
Main Contractor: Cross Keys Construction
Timber Contractor: Pinewood Structures Ltd

Waters Mass Spectrometry

Date: 21/09/2012
Location: Wilmslow
Main Contractor:
Steelwork Contractor: James Killelea & Co Ltd

City of Leicester College

Date: 14/09/2012
Location: Leicester
Main Contractor: Miller Construction
Steelwork Contractor: Adstone Construction

Furness Academy

Date: 27/08/2012
Location: Barrow in Furness
Main Contractor: Kier Construction
Timber Contractor: B&K Structures

Wigmore Street

Date: 23/07/2012
Location: Central London
Main Contractor: Wates Construction
Timber Contractor: Graham Wood Structural

University of Worcester - Sporting Arena

Date: 06/06/2012
Location: Worcester
Main Contractor: Willmott Dixon
Steelwork Contractor: Morgans of Usk

Student Accommodation

Date: 30/05/2012
Location: Preston
Main Contractor: Marcus Worthington
Steelwork Contractor: Structral Steelwork Ltd

North Durham Academy

Date: 21/05/2012
Location: Stanley, County Durham
Main Contractor: Carillion
Steelwork Contractor: Harry Marsh (Engineers) Ltd

Stanground Academy

Date: 14/05/2012
Location: Peterborough
Main Contractor: Kier Construction - Eastern
Steelwork Contractor: A C Bacon

Cranleigh Medical Centre

Date: 23/04/2012
Location: Cranleigh, Surrey
Main Contractor: Morgan Sindall
Timber Contractor: Eurban

E-ACT East Leeds Academy

Date: 19/03/2012
Location: Leeds
Main Contractor: Interserve
Steelwork Contractor: Billington Structures Limited

Southend Pier

Date: 20/02/2012
Location: Southend-on-Sea
Main Contractor: Kier Construction - Eastern
Steelwork Contractor: n/a

Cromwell Community College

Date: 30/01/2012
Location: Chatteris, Cambridge
Main Contractor: Kier Construction - Eastern
Steelwork Contractor: A C Bacon Engineering Ltd

YGG School

Date: 06/12/2011
Location: Trevethin, Wales
Main Contractor: Kier Western
Steelwork Contractor: Dollcast Ltd

Tudor Grange Academy

Date: 01/10/2011
Location: Worcester
Main Contractor: Kier Moss
Steelwork Contractor: Adstone Construction

Keynsham Road Fire Station

Date: 16/09/2011
Location: Gloucester
Main Contractor: Kier Moss
Steelwork Contractor: Adstone Construction

Waterhead Academy, Oldham

Date: 08/07/2011
Location: Oldham
Main Contractor: Willmott Dixon
Steelwork Contractor: Killelea

Roebuck Primary School

Date: 01/06/2011
Location: Stevenage
Main Contractor: May Gurney
Timber Contractor: KLH UK

St. Helens Rugby Stadium

Date: 17/05/2011
Location: St. Helens, Merseyside
Main Contractor: Barr Construction
Cladding Contractor: CSP Roofing (UK) Ltd

Royal Oak Brewery Development

Date: 01/05/2011
Location: Stockport
Main Contractor: Southdale Limited
Steelwork Contractor: Sabre Structures

St. Ambrose High School, Coatbridge

Date: 01/04/2011
Location: Coatbridge, Scotland
Main Contractor: Balfour Beatty
Steelwork Contractor: J&D Pierce

Luton Student Accommodation

Date: 01/09/2010
Location: Luton
Main Contractor: Kier Marriott
Steelwork Contractor: Billington Structures

The Town Hub – NHS LIFT Project

Date: 18/08/2010
Location: Doncaster, South Yorkshire
Main Contractor: Morgan Sindall
Steelwork Contractor: Hambleton Steel

Silverstone - New Pit & Paddock Complex

Date: 01/07/2010
Location: Towcester, Northamptonshire
Main Contractor: Buckingham Group
Steelwork Contractor: Barrett Steel Buildings

Rotherham MBC Offices

Date: 22/06/2010
Location: Rotherham, South Yorkshire
Main Contractor: GMI Construction
Steelwork Contractor: Billington Structures Ltd

Greater Manchester Police

Date: 19/01/2010
Location: Greater Manchester
Main Contractor: Carillion
Steelwork Contractor: Elland Steel Structures

The system minimises the risks of working at height, it is faster to install and more versatile than traditional scaffolding edge protection.

Robert Olley,
Senior Project Manager – Kier Eastern

The installation of easi-edge has been a great success. Our operatives were able to install the barrier very quickly and efficiently. The service we have received from easi-edge has been very professional from the start.

Peter Clayton,
Technical Contracts Manager – B&K Structures

Utilising the easi-edge system provides a flexible solution and has allowed us to integrate the installation of the system with the frame erection process. The rapid fixing process has been fundamental in reducing the frame erection time.

Steven Wheeler,
Project Manager – Kier Eastern

Eurban have now used the easi-edge system on numerous projects. Its quick fixing and versatility has been invaluable to our site teams high level of safety when erecting solid timber buildings. It has allowed us to complete high risk and complex buildings in a safe manner.

Chris Morrison,
Eurban - Managing Director

easi-edge designed and liaised with the structural steel sub- contractor to ensure all angles were covered in the erection of the easi-edge. The end result is a neat and tidy site with full edge protection to the perimeter and intermediate leading edges.

Dean Lindeque,
Senior Site Manager, Denizen Contracts

Contact us for details

  • BCSA Logo
  • Sustainability in Steel Construction logo
  • Edge Protection Federation logo
  • UKAS Logo
  • CHAS Accreditation Logo
  • Lloyds British Logo
  • TRADA Member logo
  • UK Timber Frame Association Logo