
hoard-it is a brand new site hoarding system that is practical and eco-friendly, and best of all offers return on investment with its bespoke printed panel options. more
core-safe
Our revolutionary core-safe system has been engineered to secure lift
shaft voids while building work takes place.
more
bay-master
The bay-master system provides constant protection for those working
around elevated loading areas with an innovative loading bay barrier
that prevents them from falling.
more
Latest news
easi-edge - Formula 1
12/07/2010
Construction work is well under way of the new state of the art complex. Steelwork contractor, Barrett Steel Buildings requested the services of easi-edge to provide the perimeter edge protection which will be installed on more than 1,000 tonnes of steel. easi-edge have supplied 3,000 linear metres of bolt-on edge protection to protect the workforce from falls as they erect the steel frame.
easi-edge’s Contracts Director, Peter Wroblewski, commented on the companies involvement in the new build, “To be involved in such a high profile project is an excellent testament to the quality of products and services easi-edge provide."
Scheduled for completion in 2011, the new complex will house new garages, a race control building, media centre, hospitality and VIP spectator zones.