easi-edge media library

You can download our brochures, images and videos here.

Image gallery

29/09/2010

29/09/2010

26/10/2010

26/10/2010

26/10/2010

The system minimises the risks of working at height, it is faster to install and more versatile than traditional scaffolding edge protection.

Robert Olley,
Senior Project Manager – Kier Eastern

The installation of easi-edge has been a great success. Our operatives were able to install the barrier very quickly and efficiently. The service we have received from easi-edge has been very professional from the start.

Peter Clayton,
Technical Contracts Manager – B&K Structures

Utilising the easi-edge system provides a flexible solution and has allowed us to integrate the installation of the system with the frame erection process. The rapid fixing process has been fundamental in reducing the frame erection time.

Steven Wheeler,
Project Manager – Kier Eastern

Eurban have now used the easi-edge system on numerous projects. Its quick fixing and versatility has been invaluable to our site teams high level of safety when erecting solid timber buildings. It has allowed us to complete high risk and complex buildings in a safe manner.

Chris Morrison,
Eurban - Managing Director

easi-edge designed and liaised with the structural steel sub- contractor to ensure all angles were covered in the erection of the easi-edge. The end result is a neat and tidy site with full edge protection to the perimeter and intermediate leading edges.

Dean Lindeque,
Senior Site Manager, Denizen Contracts

Contact us for details

  • BCSA Logo
  • Sustainability in Steel Construction logo
  • Edge Protection Federation logo
  • UKAS Logo
  • CHAS Accreditation Logo
  • Lloyds British Logo
  • TRADA Member logo
  • UK Timber Frame Association Logo